Appleton/Glenwood Wastewater Treatment Facility

by: admin swe

Effluent from Appleton and Glenwood is pumped to The Abydoz Engineered Wetland system. It then passes through a small building where nonorganic material is discharged by a grinder and a screen. The flow then enters a series of settling chambers for solids to settle out. The main flow is split between the 4 horizontal slow wetland beds and then recombined with the treated storm water and discharged to Gander River. The sludge is pumped to sludge treatment wetland cells where it is mineralized and can be reused for landscaping.

This project has garnered extensive attention, including the following awards: